How We Operate

We carry out our operation process in the best way.
Design

Designing

All artworks must be approved by the graphic department before production process.

Shrink Wrapped & Secured

Shrink Wrapping

All pallets are shrink wrapped and secured with corner protectors.

Pallets

Edge Protectors

It is possible to use corrugated protectors on any side of pallet to provide more protection during transportation.

Pallets

Secured Pallets

Transported on internationally accepted heat treated fumegated pallets.

Production Time

Production Time

Production lead time for customised printed cups is 25 to 35 days.

Shipping

Shipping

Transit period of truck loading is maximum 15 days to European countries.